UK leader in Construction Chemicals

Menu

Draft Specification

  • Cut out and repoint the (Specify areas) removing the old mortar to a depth of (Specify Depth mm.)
  • Preparation and cutting out should be carried out in accordance with Method statement CC01 (standard brickwork and coursed stone) or SS01 (soft brickwork / stonework and irregular masonry joints) available from PAREX Streetscape & Facades.
  • Repointing should be carried out by gun injection using (select one of)
    • PAREX Standard dry blended, pre-packed gun injection mortar and installed strictly in accordance with method statement number SM02.
    • PAREX Historic dry blended pre-packed gun injection mortar and installed strictly in accordance with method statement number HM02.
    • Restoration Mortar dry packed gun injection mortar Grade and installed strictly in accordance with method statement number RM02.
    • Lime Putty Mortar and installed strictly in accordance with method statement number LPM02
    • PAREX Marine dry packed gun injection mortar and installed strictly in accordance with method statement number MAR02.
    • PAREX SR sulphate resistant dry packed gun injection mortar and installed strictly in accordance with PAREX method statement number SM02.
  • Curing and finishing to be in accordance with method statement EP03.
  • Contacts

Choose your nearest area...

Your Parex representative: